<script type="text/javascript">
var visit ='<data:blog.url/>';
visit = visit.replace(/.*\/\/[^\/]*/, '');
location.href = 'http://miscircuitos.com/how-to-read-rc-radio-signals-with-arduino-using-ppm-signal-tutorials/';
</script>
<br />
<div class="separator" style="clear: both; text-align: center;">
<span style="text-align: left;"><b>D</b></span><span style="text-align: left;"> } </span></div>
<div class="" style="clear: both; text-align: left;">
<pre></pre>
</div>
Thursday, November 17, 2011
Friday, May 20, 2011
A report recorded on Cosmobot 2011 by tve2
The tve2 channel, the spanish public tv, has yet upload a report about cosmobot 2011. Cosmobot 2011 is the most important robotic event in Spain. From 31.00 minute to the end, the robotic competition video can be seen.
http://www.rtve.es/alacarta/ videos/la-aventura-del-saber/ aventura-del-saber-18-05-11/ 1104508/
http://www.rtve.es/alacarta/
Here you can see the video about the last year. (2010)
Thursday, March 31, 2011
Friday, March 4, 2011
Thursday, February 17, 2011
Sumo Robot
My main project this year 2011 is designing and building a sumo robot. I have my university support (UPCT). They give me all the materials, place, tools, help ... The idea is to participate in the National League of the robotic competition.
All the rules of the competition are ilustrated in the David Cook's page.
Today is nearly 14th February and i'm going to start the construction. I already have all the components at home. The objective is to have prepaired everything for Cosmobot competition (19th March). I think the steps are:
All the rules of the competition are ilustrated in the David Cook's page.
Today is nearly 14th February and i'm going to start the construction. I already have all the components at home. The objective is to have prepaired everything for Cosmobot competition (19th March). I think the steps are:
Goals | Fecha |
| Schematic design, buy the electronic components and register | 21 Feb |
chassis design and rute the PCB. | 25 Feb |
| Make the PCB, solder the ic and test the hardware | 3 Mar |
| Manufacter the wheels and fabricate the final chassis | 5 Mar |
| Basis test with all mounting | 7 Mar |
| Programming | 14 Mar |
| edge | 14-18 Mar |
Soon I will update the blog with more details.
Subscribe to:
Posts (Atom)

